The last class of claim from the #1312 docs audit that I could not verify, recorded rather than left implicit.
What is claimed
Nine tutorials quote running costs, and several quote durations:
| Tutorial | Claim |
|---|---|
eks-kubernetes |
EKS control plane ~$73/mo, NAT ~$32/mo, ALB ~$16/mo, 3× t3.medium ~$100/mo, total ~$221/mo |
aks-kubernetes |
control plane free, App Gateway ~$20/mo, 3× Standard_B2s ~$75/mo, total ~$95/mo |
cockroachdb-multi-region |
|
gitlab-cells |
|
fargate-lucene-efs-solr |
NAT ~$32/mo + ALB ~$16/mo + EFS |
gitlab-aws-alb |
NAT ~$32/mo + ALB |
Plus durations: ~10 min (×3), ~5 min (×2), ~3 min, 2–5 minutes.
What I could check, and what I could not
The arithmetic is right. Every stated total sums from its own parts: 73+32+16+100 = 221, 20+75 = 95, 32+16 = 48 twice. The ~$48+/mo correctly carries a + for the usage-based EFS component rather than pretending it is fixed.
The unit prices are unverifiable from inside the repo. Whether an EKS control plane is still $73/mo, or a NAT gateway $32/mo, is a question for a pricing API on a given date in a given region — none of which the claims state. Cloud list prices move, regions differ by a lot, and none of these say "as of when" or "in which region". A reader has no way to tell whether they are reading a current figure or one written two years ago, and neither do I.
The durations have the same shape but lower stakes: they depend on cluster provisioning times that vary by provider and load.
Why not just verify them
Verifying means either wiring a pricing API into a docs check — real work, and a network dependency in CI for prose — or standing up each stack and reading a bill. Neither is proportionate to the claim being made, which is "this costs enough that you should tear it down".
Options
- Date and scope them.
~$221/mo (us-east-1 list price, checked 2026-08). Cheapest, and turns an unfalsifiable number into one a reader can age out themselves. The teardown warning — which is the actual point — keeps working regardless. - Replace precision with magnitude. "Tens of dollars a day" / "a few hundred a month". Cannot go stale in the way a figure can, and preserves the decision the reader is making.
- Derive them. A pricing lookup at docs-build time. Highest fidelity, disproportionate cost, and a new external dependency in the docs pipeline.
- Drop them, keeping only the teardown instruction.
I would take 1 for the per-service breakdowns, since the arithmetic is already sound and only the provenance is missing.
Note
This is the one area of the docs audit where I am flagging rather than fixing, because picking numbers is not mine to do: correcting them means asserting current prices I have no source for, and the alternative — deleting them — removes information a reader is using.
Activity
docs: truth sweep — stamp tutorial cost estimates, fix stale temporal…
lex00 commentedon Aug 25, 2026
Shipped in PR #1922: six tutorial cost estimates stamped with date (2026-08), region, and chant version (0.46.0) per the issue's option 1.