Skip to content

Tutorial cost and duration estimates are undated, unscoped, and unverifiable #1418

Closed

Description

@lex00

The last class of claim from the #1312 docs audit that I could not verify, recorded rather than left implicit.

What is claimed

Nine tutorials quote running costs, and several quote durations:

Tutorial Claim
eks-kubernetes EKS control plane ~$73/mo, NAT ~$32/mo, ALB ~$16/mo, 3× t3.medium ~$100/mo, total ~$221/mo
aks-kubernetes control plane free, App Gateway ~$20/mo, 3× Standard_B2s ~$75/mo, total ~$95/mo
cockroachdb-multi-region $1.90/hr ($46/day) across three regions
gitlab-cells $1.17/hr for two cells ($28/day)
fargate-lucene-efs-solr NAT ~$32/mo + ALB ~$16/mo + EFS $0.30/GB-mo = **$48+/mo**
gitlab-aws-alb NAT ~$32/mo + ALB $16/mo = **$48/mo**

Plus durations: ~10 min (×3), ~5 min (×2), ~3 min, 2–5 minutes.

What I could check, and what I could not

The arithmetic is right. Every stated total sums from its own parts: 73+32+16+100 = 221, 20+75 = 95, 32+16 = 48 twice. The ~$48+/mo correctly carries a + for the usage-based EFS component rather than pretending it is fixed.

The unit prices are unverifiable from inside the repo. Whether an EKS control plane is still $73/mo, or a NAT gateway $32/mo, is a question for a pricing API on a given date in a given region — none of which the claims state. Cloud list prices move, regions differ by a lot, and none of these say "as of when" or "in which region". A reader has no way to tell whether they are reading a current figure or one written two years ago, and neither do I.

The durations have the same shape but lower stakes: they depend on cluster provisioning times that vary by provider and load.

Why not just verify them

Verifying means either wiring a pricing API into a docs check — real work, and a network dependency in CI for prose — or standing up each stack and reading a bill. Neither is proportionate to the claim being made, which is "this costs enough that you should tear it down".

Options

  1. Date and scope them. ~$221/mo (us-east-1 list price, checked 2026-08). Cheapest, and turns an unfalsifiable number into one a reader can age out themselves. The teardown warning — which is the actual point — keeps working regardless.
  2. Replace precision with magnitude. "Tens of dollars a day" / "a few hundred a month". Cannot go stale in the way a figure can, and preserves the decision the reader is making.
  3. Derive them. A pricing lookup at docs-build time. Highest fidelity, disproportionate cost, and a new external dependency in the docs pipeline.
  4. Drop them, keeping only the teardown instruction.

I would take 1 for the per-service breakdowns, since the arithmetic is already sound and only the provenance is missing.

Note

This is the one area of the docs audit where I am flagging rather than fixing, because picking numbers is not mine to do: correcting them means asserting current prices I have no source for, and the alternative — deleting them — removes information a reader is using.

Activity

  1. added
    area:docs
    documentation
    on Aug 23, 2026
  2. lex00 commented on Aug 25, 2026

    @lex00
    ContributorAuthor

    Shipped in PR #1922: six tutorial cost estimates stamped with date (2026-08), region, and chant version (0.46.0) per the issue's option 1.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    area:docsdocumentation

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions