The order of work for epic:delivery across chant, terragucci, plywood, sql-yodeler, behold and intentius.github.io, as of 2026-11-18 (chant main; terragucci and plywood pin 0.124.106, sql-yodeler ^0.124.105, behold ^0.124.107).

The goal: a change goes from merge through every environment, in stages, each behind a gate that can read the change's risk and the last stage's health, with rollback and agent fixes that take the same gates. chant holds every mechanism; terragucci, plywood and sql-yodeler add config and words and switch it on; behold draws what chant records, the same for Pulumi and SQL as for Terraform.

The pipeline stays synthesis. Its declaration folds under TypeScript as data, so it can be read and diffed before anything runs, and ops are the part that executes.

Tick a line when its issue closes. Lines in one phase run in parallel unless a line says what it waits on. Revised after an audit on 2026-11-18: sql-yodeler joined, several issues were rescoped to what chant already ships, and phases were split so nothing waits on a later line. Checked again against each repo's main on 2026-11-19: dependencies added where an issue named one the epic left out, and claims that disagreed with the code corrected on the issues (#5327, #5333, #5340, #5349 and the product issues below). A second adversarial audit the same day corrected two of those edits (INTENTIUS/terragucci#1498 and #5340), removed acceptance cycles around INTENTIUS/behold#1228, and added missing floors, pins and dependencies. #5344, #5346 and #5347 moved out, since no delivery line depends on them: #5346 to #5351, #5347 to #5352, and #5344 runs on its own. A third, blind audit on 2026-11-19 corrected the health inventory (#5338), the ownership premise (#5333) and #5328's rollback refusal, removed a cycle between #5327 and #5342, settled how products produce the pipeline file and what takes a merge to the first stage (#5324), gave the soak hold-or-restart per check (#5326), and added the adoption keys and EVIDENCE rows the product issues were missing. On 2026-11-19 the epic was also checked against Pulumi Delivery and Pulumi Agents as their docs read that day; #5353 to #5358 cover what they ship and this plan lacked (stage graphs, rejecting a release, pausing a stage, release artifacts, agent steps, and agents from a failed apply or a schedule), and the comment on this issue lists each Pulumi claim against its issue.

Phase 0: now, nothing waits on new chant mechanisms

chant:

terragucci:

plywood:

sql-yodeler:

behold and site:

Phase 1: chant foundations, in parallel

Pipeline:

Graph, for Pulumi and choudoufu (each independent):

Health:

Lifts from the products (each independent):

Gates and agents:

Keeping up (each independent):

Phase 2: on phase 1

chant, after #5324:

Products, each after the lines it names. INTENTIUS/plywood#158 comes before INTENTIUS/behold#1228, and INTENTIUS/behold#1228 before INTENTIUS/sql-yodeler#385 and the audit part of INTENTIUS/terragucci#1494, so behold reads the new format before a product stops writing the old one:

Phase 3: on #5326

Phase 4: adoption

Phase 5: proof

What the open lines wait on

Every chant line is closed. chant 0.124.110 and behold 0.34.3 are released.

open lines waits on who
the plywood EVIDENCE rows all eight recorded and passing, merged in INTENTIUS/plywood#182 none
the sql-yodeler pipeline row the stage's own wave: yodel approve records its approval at the merge pipeline's wave gate, where nothing waits (INTENTIUS/sql-yodeler#415). The stage gate is fixed in INTENTIUS/sql-yodeler#416 orchestrator for the sql-yodeler fix; maintainer grant for the run
the terragucci rows all recorded and passing, agent/drift and tg-rollback, tg-promote and tg-stage-promote included, in INTENTIUS/terragucci#1529 on chant 0.124.116 the merge queue
a lint warning when a stage and a component in it both ask for approval #5482. #5479 and #5480 are done in #5487 a chant change

Maintainer steps

  1. The chant release. In the chant checkout:
git fetch origin
just release-when-green --dry-run
just release-when-green
package version the dry run plans
core 0.124.110
lexicon-aws 0.124.105
lexicon-azure 0.124.104
lexicon-gcp, lexicon-pulumi, lexicon-terraform 0.124.103
lexicon-cedar, lexicon-github, lexicon-forgejo, lexicon-gitlab 0.124.102
  1. Releases of each product once their drafts have merged. (chant 0.124.110 and behold 0.34.3 are out.)

  2. Recordings, each in the repo's checkout after its drafts merge. terragucci and sql-yodeler refuse an agent without a grant from the maintainer's terminal: just grant respond/triage agent/drift capture in terragucci and npm run grant -- pipeline in sql-yodeler, after which the orchestrator runs exactly the granted names.

repo before then, once per name
terragucci validation stack up; just claims respond/triage agent/drift && just evidence npx tsx stack/harness/harness.ts run <name> --record
plywood just e2e image and just e2e up just e2e claim <name>, then just e2e down
sql-yodeler emulator up just claims pipeline, then just claims-page
repo names
terragucci tg-promote tg-rollback tg-agent-alert tg-stage-canary tg-stage-promote tg-stage-risk tg-stage-soak tg-stage-rollback-request
plywood pw-rollback pw-promote pw-alert-agent pw-soak-hold pw-stage-canary pw-risk-record pw-rollback-request pw-pipeline

Rules for this epic

  • A mechanism found in a product moves to chant first; the product only maps its config onto it (as in epic:ci-products, ci-products: the remaining work after 0.124.76 #4775). Check what chant already ships before adding it.
  • Every chant issue exports a *_FLOOR for what it adds and regenerates packages/core/src/floor-table.data.ts with npx tsx scripts/floor-table.ts, which the release check requires. A lexicon's floors go in its src/chant-floors.ts; the pulumi lexicon has none yet. Every adoption issue moves its product's chant and lexicon pins to that release, behold included.
  • New product keys take their words from ci-product: one key vocabulary for product config #5343, so each is spelled once across the products.
  • Nothing turns on by default in the pass that adds it.
  • Risk, soak and agents never let a plan apply with nobody approving it. Risk can only add approval requirements; it never feeds a product's unattended-apply setting (terragucci's allow_unattended).

Acceptance criteria

  • Every line above is ticked, or moved out of the epic with a reason on its issue.
  • A change in a terragucci repo, a plywood repo and a sql-yodeler repo each go dev, staging, prod through chant's folded pipeline, with a risk record, a soak and a gate per stage, recorded in EVIDENCE. The path is pipeline: one TypeScript declaration of stages and waves, folded to a spec before anything runs #5324's: the merge applies the first stage and cuts a release, and each later stage promotes that release through its gate.
  • The same EVIDENCE shows a canary holding the stages after it, a failed soak requesting a rollback that applies after its gate, and an agent job started by a failed verify and by an alert.
  • behold draws a Pulumi member with the same features as a Terraform root, draws stage state, and reads each product's bucket in chant's format.
  • The compare pages' cells match what shipped.

Sub-issues

Sub-issues

3 of 3 Issues completed
Loading 3 sub-issues

Activity

  1. added
    epic
    epic:delivery
    on Nov 18, 2026
  2. lex00 commented on Nov 19, 2026

    @lex00
    ContributorAuthor

    Pulumi Delivery and Pulumi Agents against this plan, read 2026-11-19 from Pulumi's launch post, concepts, stages and gates, sources and triggers, stacks and jobs, agent step, agent triggers, the Agents post and the Delivery and Agents product pages. Delivery is in public preview; approval and decision gates, the agent step and agent triggers are Pro and Enterprise.

    Pulumi claim Here
    Pipeline is a program in several languages, registered, read from the default branch #5324, folded TypeScript read at base
    Stages ordered with from, several upstreams, a join waits for the same release in each #5353
    One release per stage at a time; a newer waiting run replaces an older one #5353
    Release pins one commit per source across repos; numbered releases release cut today; across repos through #5356's digest on the dispatch
    Push and path triggers, manual start, REST dispatch product workflows today
    Manual gate with a description #5324 manual hold, description in #5354
    Approval gate: users or teams, count, approvers see a preview that "might still change" quorum rules today, bound to the plan digest; #5349 proves approvers
    Approvers can reject a release #5354
    all / any composite gate rules, nested #5354
    Decision gate: Jev rates the preview per question against maximumRisk; fails when the preview is too large #5325, with per-question thresholds and an unknown answer that holds
    AI reviewer promotes or escalates a change #5325: risk only adds approvals; nothing applies unapproved
    Jobs with shell, image, outputs; a failed job fails the stage stage hooks and verify steps in #5324
    Smoke tests stop a bad release verify steps today; #5326 soak over time, which Delivery's docs do not describe
    Failed release waits; retry the failed updates on the same commit wave re-run today
    Pause and resume a stage #5355
    Roll back a stage to an earlier release, which also pauses it components rollback --release today; the pause in #5355; requested rollback on failure in #5328
    Redeploy the current release components redeploy today
    Force-promote past a gate, audit-logged #5355's urgent rule: one proven approval from a named role, since this epic never applies unapproved
    Artifacts a stage publishes, read by other pipelines; a PipelineSource trigger starts downstream runs #5356; <product>-applied dispatch today
    Per-stage ESC environment, staging never holds production keys; pipeline runs as its own principal #5348, per-stage identity test
    Editors can lack approve and force-promote permission; audit log of approvals and stage changes signers and roles at base today; the ledger and #5336
    Canary, blue-green, multi-region as user code #5327 canary with soak; #5353 fan-out
    Agent step in a stage with responseSchema; output read downstream #5358, read-only and never approving
    Agents start from PagerDuty, Honeycomb, Sentry, Datadog and generic webhooks with a shared secret and Idempotency-Key, batched #5329, with dedupe and a join window
    Agents start from Pulumi events: failed update, drift drift today; failed apply in #5357; failed verify or soak in #5339
    Scheduled agent tasks #5357
    Agent has its own identity and role; widening it takes a reviewed PR; changes go through policy and approval read and write tokens split today, with never-apply, never-approve and never-merge tests; #5357 makes agent specs and caps read at base, so a pull request cannot widen the agent that runs on it
    Agent PRs reviewed; PR preview review comments agent pull requests and the review agent today
    Agents in Slack and editor panels; self-hosted model gateways not planned in this epic
  3. lex00 commented on Nov 20, 2026

    @lex00
    ContributorAuthor

    Phase 0 report, 2026-11-20

    Twelve of sixteen lines closed through their own pull requests. The four open lines wait on the Phase 1 chant release or on maintainer recordings. Repos below are in the INTENTIUS org.

    Merged

    issue pull request note
    chant#5343 chant#5359 key vocabulary page and PRODUCT_CONFIG_WORDS
    chant#5360 chant#5362 per-environment step target; added to Phase 0 after plywood#154 found promote re-applied a fixed stack
    terragucci#1496 terragucci#1501
    terragucci#1498 terragucci#1502
    terragucci#1499 terragucci#1500 guard on chant's installAgentGuard
    plywood#36 plywood#162 hooks through chant's wave hooks
    plywood#159 plywood#163 behold 0.34.2 pin
    plywood#160 plywood#161 criterion corrected on the issue to six recipes
    sql-yodeler#387 sql-yodeler#389 closed by hand, since the pull request body carried another issue's text
    behold#1044 behold#1237 criterion corrected on the issue to the declared member
    intentius.github.io#36 intentius.github.io#38
    intentius.github.io#37 intentius.github.io#39 EVIDENCE refresh moved to the maintainer steps below

    Two more merged toward open lines. plywood#165 adds positional rollback for plywood#154, and sql-yodeler#388 adds the refused-wave diff for sql-yodeler#386.

    Open

    issue waits on who
    terragucci#1492 a chant release carrying chant#5360; terragucci#1504 stays a draft until then maintainer (release)
    plywood#154 plywood promote, on a chant release carrying chant#5360 maintainer (release)
    plywood#155 the pw-rollback scenario (an agent is writing it), then recorded runs orchestrator, then maintainer
    sql-yodeler#386 the summary part, on chant#5335 and a release orchestrator, then maintainer (release)

    New issues from this phase: behold#1238 (an overlay read connects to the SQL database by default), plus terragucci#1503, plywood#164 and sql-yodeler#390, which move each product's keys to the vocabulary once a release carries it.

    Maintainer steps from Phase 0

    1. terragucci, to refresh the rows the Arena AI cell links:
      just claims respond/triage agent/drift && just evidence
    2. plywood#155, once the pw-rollback scenario merges: just e2e up, then just e2e claim pw-rollback. The promote row follows plywood#154 with just e2e claim pw-promote.
    3. terragucci, after terragucci#1504 merges: npx tsx stack/harness/harness.ts run tg-promote --record, then npx tsx stack/harness/harness.ts run tg-rollback --record.
    4. plywood, before its next release: just behold-pin confirms npm serves behold 0.34.2.
  4. lex00 commented on Nov 20, 2026

    @lex00
    ContributorAuthor

    Phase 1 report, 2026-11-20

    All sixteen Phase 1 lines closed through their own pull requests. Phase 1's chant work now waits on a release, which is a maintainer step.

    Merged

    issue pull request note
    #5324 #5367 pipeline declaration folds to .chant/pipeline.json; product specs proven byte identical on fixtures
    #5330 #5363 claim corrected on the issue
    #5331 #5371 edges in chant workspace graph; no new EdgeGrain value (noted on the issue)
    #5332 #5372
    #5333 #5366 plunge drift records carry no ownership yet
    #5334 #5374 input.cost fields are camelCase (noted on terragucci#1494)
    #5335 #5365 chant's generated jobs carry the summary settings
    #5336 #5361
    #5338 #5364 a resource the readers do not cover reads unknown
    #5340 #5375
    #5341 #5369 pulumiCostHold({ approveAbove, command }), no default estimator
    #5345 #5376 replan runs inside chant run wave; a sensitive output gets no digest
    #5348 #5370 a wave that runs before merge refuses a set holding secrets
    #5349 #5368 criterion 1 corrected on the issue; an unprovable rule warns in this release
    #5329 #5373 the relay starts the agent workflow (decision recorded on the issue)
    #5357 #5377 agent jobs now refuse a commit off the default branch, and generated command lines carry a settings digest

    Filed during the phase

    Waiting

    item waits on who
    chant release with Phase 1 the release step below maintainer
    INTENTIUS/terragucci#1492 (draft INTENTIUS/terragucci#1504) that release, then a pin move maintainer, then orchestrator
    INTENTIUS/plywood#154 promote that release maintainer, then orchestrator
    INTENTIUS/sql-yodeler#386 (draft INTENTIUS/sql-yodeler#391) that release, then a pin move maintainer, then orchestrator
    INTENTIUS/plywood#155 INTENTIUS/plywood#166 in its queue, then recorded runs maintainer
    Phase 2 chant lines none; they start now on main orchestrator

    Maintainer step: the Phase 1 chant release

    A dry run at the last green commit plans this train:

    package version
    core 0.124.110
    lexicon-aws 0.124.105
    lexicon-azure 0.124.104
    lexicon-gcp, lexicon-pulumi, lexicon-terraform 0.124.103
    lexicon-github, lexicon-forgejo, lexicon-gitlab 0.124.102

    Core's prepack writes each floor still on NEXT_RELEASE as the packed version, so no floor edit comes first. Run these in the chant checkout:

    git fetch origin
    just release-when-green --dry-run
    just release-when-green
    

    The dry run plans and writes nothing. The last command brings main's head to green and dispatches the release, then waits on the publish.yml run.

  5. lex00 commented on Nov 20, 2026

    @lex00
    ContributorAuthor

    Phases 2 and 3, chant side: report of 2026-11-20

    Every chant line of Phases 2 and 3 is closed through its own pull request except #5399, filed today and in progress. The product lines wait on one chant release. Repos below are in the INTENTIUS org.

    Merged

    issue pull request note
    chant#5378 chant#5380 pulumi disruption classes from the preview observation
    chant#5353 chant#5382 after on stages; queue: "replace" opt-in
    chant#5356 chant#5381 named "stage artifacts" in code, since "release artifacts" already names a cut's files
    chant#5385 chant#5389 artifact reads checked against the after graph
    chant#5354 chant#5383 a comment records a rejection where the stage's mode accepts the forge's identity; a sealed stage now counts only sealed approvals at promote
    chant#5355 chant#5384 pause after rollback is opt-in (comment on the issue)
    chant#5325 chant#5386 a promote has no change set, so a later stage reads the release's score through chant#5387
    chant#5387 chant#5393 a later stage's holds.risk with no first-stage score is refused at build
    chant#5326 chant#5390 all 83 terragucci soak fixtures pass
    chant#5358 chant#5398 a step sits on a stage after the first and reads artifacts and earlier answers
    chant#5327 chant#5397 canary holds later stages through the same soak
    chant#5339 chant#5395 one definition of a failed verify, shared with chant#5328
    chant#5328 chant#5396 a failed canary soak requests the canary stage's rollback
    chant#5391 chant#5392 65 missing egress catalogue rows, which the e2e suite before a release reads
    (chant#5355) chant#5394 the urgent gate binds the release digest

    Open

    item waits on who
    chant#5399 agent building orchestrator
    plywood#167 (#35), plywood#168 (#158), plywood#169 (#157) drafts; the chant release, then a pin move maintainer (release), then orchestrator
    terragucci#1506 (#1495) draft; the chant release, then a pin move maintainer (release), then orchestrator
    behold#1227, behold#1228 agents building on a local pack orchestrator
    sql-yodeler#385, the audit part of terragucci#1494 behold#1228 orchestrator
    terragucci#1494 (cost and summary part), terragucci#1497 (adoption) the chant release maintainer (release), then orchestrator

    Decisions for the maintainer

    • chant#5388: an agent's Cedar permit passes an enforce gate with no person approving, as guide/ops.mdx documents. The epic's rule says no plan applies with nobody approving it. Options (a), (b) and (c) are on the issue.
    • Neither approve hint names the release, since the ledger binds it. Naming it in approveCommand would be a separate change.

    Maintainer step: the chant release

    A dry run at the last green commit plans this train:

    package version
    core 0.124.110
    lexicon-aws 0.124.105
    lexicon-azure 0.124.104
    lexicon-gcp, lexicon-pulumi, lexicon-terraform 0.124.103
    lexicon-cedar, lexicon-github, lexicon-forgejo, lexicon-gitlab 0.124.102

    Run these in the chant checkout:

    git fetch origin
    just release-when-green --dry-run
    just release-when-green
    

    The dry run plans and writes nothing. The last command brings main's head to green and dispatches the release, then waits on the publish.yml run. After it, each product's draft moves its pin, and the adoption lines of Phase 4 can start.

    New maintainer recordings

  6. lex00 commented on Nov 20, 2026

    @lex00
    ContributorAuthor

    Closing report, 2026-11-20

    Every chant line on this epic is closed through its own pull request. Each product line has a draft pull request that passed the repo's full gate against a build of chant main. What is left waits on maintainer steps: the chant release, then product and behold releases, then the recorded EVIDENCE runs. Repos below are in the INTENTIUS org.

    Merged since the earlier report

    issue pull request note
    chant#5342 chant#5411 stage, soak, risk and rollback fields in workspace status
    chant#5379 chant#5417 an approval rule nobody can prove is refused
    chant#5388 chant#5415 an agent's permit passes a gate alone only behind an explicit opt-in key; stage gates refuse it
    chant#5399 chant#5400 --wave-summary and --agent-facts on the pull-request loop
    chant#5401 chant#5410 a gate step applies only in the environments it names
    chant#5402 chant#5412 per-instance ownership rows
    chant#5403 chant#5409 IRNode.component for Pulumi component groups
    chant#5405 chant#5408 aliases read inside a scope
    chant#5406 chant#5414 agent facts on the split gate and record jobs
    chant#5407 chant#5413 approve hints carry the digest
    chant#5416 chant#5418 the cost hold prices a redacted plan, with redactEnv and dropEnv
    chant#5419 chant#5420 stage queues for every stage, on their own member
    chant#5421 chant#5423 a product key for stage hooks
    chant#5422 chant#5424 the risk record reaches a product's after-plan hook
    chant#5425 chant#5426 pipeline helpers map stage risk and replan and take the product's image
    chant#5427 chant#5428 a promote runs a stage's op wave for products with no components
    chant#5429 chant#5432 nodes for bound objects no configuration declares
    chant#5430 chant#5431 a key inside its alias's path is not reported as both set
    chant#5433 chant#5434 the cost hold redacts values a run's own environment holds
    chant#5391 chant#5392 65 missing egress catalogue rows

    All of these passed just check together on one branch before they queued. chant#5404, catalogs for the 14 lexicons that have none, sits outside the epic, and behold keeps its name matcher for those lexicons until it lands.

    Product drafts

    Each passed its repo's full gate against chant main, apart from pin-only items (generated files naming the pinned chant, a test comparing the installed lexicon with the pin) and load timeouts that pass alone.

    repo draft closes
    terragucci terragucci#1504, #1506, #1507, #1508, #1509, #1510 terragucci#1492, #1495, #1497, #1494, #1503, #1493
    plywood plywood#167, #168, #169, #170, #171, #172 plywood#35, #158, #157, #154, #164, #156
    sql-yodeler sql-yodeler#391, #392, #393, #394 sql-yodeler#386, #390, #385, #384
    behold behold#1239, #1240, #1241 behold#1228, #1227, #1236
    item waits on who
    every product draft the chant release, then its pin moves in the draft maintainer, then orchestrator
    sql-yodeler#393 and the audit part of terragucci#1508 a behold release carrying behold#1228 maintainer
    plywood#155 the recordings below maintainer
    the Phase 5 site issue Phase 4 closing orchestrator

    Maintainer steps, in order

    1. The chant release. A dry run at the last green commit plans this train:
    package version
    core 0.124.110
    lexicon-aws 0.124.105
    lexicon-azure 0.124.104
    lexicon-gcp, lexicon-pulumi, lexicon-terraform 0.124.103
    lexicon-cedar, lexicon-github, lexicon-forgejo, lexicon-gitlab 0.124.102

    Run it in the chant checkout:

    git fetch origin
    just release-when-green --dry-run
    just release-when-green
    
    1. behold's release follows once behold#1239, feat(helm): addArchiveHelmRender + media type registration #1240 and feat(helm): lint rule — pinned render must not carry Secret data #1241 have moved their pins and merged. Each product's own release follows its drafts.

    2. The recordings, each in the repo's own checkout after its drafts merge.

    terragucci, with the validation stack up

    just claims respond/triage agent/drift && just evidence
    npx tsx stack/harness/harness.ts run tg-promote --record
    npx tsx stack/harness/harness.ts run tg-rollback --record
    npx tsx stack/harness/harness.ts run tg-agent-alert --record
    npx tsx stack/harness/harness.ts run tg-stage-canary --record
    npx tsx stack/harness/harness.ts run tg-stage-promote --record
    npx tsx stack/harness/harness.ts run tg-stage-risk --record
    npx tsx stack/harness/harness.ts run tg-stage-soak --record
    npx tsx stack/harness/harness.ts run tg-stage-rollback-request --record
    

    plywood

    just e2e image
    just e2e up
    just e2e claim pw-rollback
    just e2e claim pw-promote
    just e2e claim pw-alert-agent
    just e2e claim pw-soak-hold
    just e2e claim pw-stage-canary
    just e2e claim pw-risk-record
    just e2e claim pw-rollback-request
    just e2e claim pw-pipeline
    just e2e down
    

    sql-yodeler, with the emulator up

    just claims pipeline
    just claims-page
    

    The scenarios behind these rows have never run on a bench, so a first run may need a fix in the scenario itself; the agents named the likely spots in each pull request's body.

    Follow-ups outside the epic

    • chant#4472: the 5s unit-test budget trips on loaded CI shards; times from this epic's runs are on the issue.
    • chant#5404: reference catalogs for the lexicons that have none.
  7. lex00 commented on Nov 21, 2026

    @lex00
    ContributorAuthor

    Phase 4 report

    Phase 4 is closed. chant 0.124.110 and behold 0.34.3 are released, and every product line in the phase is ticked.

    repo merged pull requests
    terragucci #1504, #1506, #1507, #1508, #1509, #1510, #1511
    plywood #166, #167, #168, #169, #170, #171, #172
    sql-yodeler #391, #392, #393, #394
    behold #1239, #1240, #1241

    The merge queue holds #1512, which corrects the newest minReader the behold guide names for behold 0.34.3.

    open waits on who
    plywood#155 and the plywood EVIDENCE rows the local bench recording now running orchestrator
    the terragucci and sql-yodeler EVIDENCE rows a grant from the maintainer's terminal (commands under Maintainer steps) maintainer, then orchestrator
    site#40 its pull request orchestrator
    releases of terragucci, plywood and sql-yodeler a release run in each repo maintainer
  8. lex00 commented on Nov 21, 2026

    @lex00
    ContributorAuthor

    Delivery report, 2026-11-21

    Merged

    The three products moved to chant 0.124.112 with the forge-checks release gate in terragucci#1514, plywood#178 and plywood#179, and sql-yodeler#396.

    Recorded rows

    • plywood: seven of eight rows recorded. pw-risk-record fails (chant#5443).
    • terragucci: tg-stage-risk, tg-agent-alert and respond/triage recorded. agent/drift fails twice and is marked failing in EVIDENCE.md (terragucci#1517).
    • sql-yodeler: the pipeline row fails at the release cut on both runs (chant#5444).

    Releases

    Package Version
    @intentius/behold 0.34.4
    @intentius/sql-yodeler 0.14.0
    @intentius/plywood 0.4.0
    @intentius/terragucci 0.4.64

    chant stays at 0.124.112, released before this round. No chant fix merged during it.

    Open

    Issue Blocks Waits on
    chant#5443 pw-risk-record a chant fix
    chant#5444 sql-yodeler pipeline row a chant fix and release, then a maintainer grant
    terragucci#1517 agent/drift a terragucci fix, then a maintainer grant
    terragucci#1515 (closed by terragucci#1519) the six tg-* stage and promote scenarios a re-run under a maintainer grant
    sql-yodeler#397, sql-yodeler#398 none of the rows work already under way in their own branches
  9. lex00 commented on Nov 22, 2026

    @lex00
    ContributorAuthor

    Rows by name, after the retries

    The report above counted rows. Here each row named on this epic is listed with its result.

    plywood

    Row Result
    pw-rollback recorded, passing
    pw-promote recorded, passing
    pw-alert-agent recorded, passing
    pw-soak-hold recorded, passing
    pw-stage-canary recorded, passing
    pw-rollback-request recorded, passing
    pw-pipeline recorded, passing
    pw-risk-record failing, #5443

    terragucci

    tg-stage-risk, tg-agent-alert and respond/triage are recorded and passing. agent/drift fails, INTENTIUS/terragucci#1517.

    The six scenarios below failed first on INTENTIUS/terragucci#1515. After INTENTIUS/terragucci#1519 they had their retry on the local stack, and each failed again. INTENTIUS/terragucci#1523 records them as failing.

    Row Step Log line Issue
    tg-promote cut-r1 commit 6d7e26bbf2e9 is not green: a check did not pass on forgejo: terragucci/apply (failure) [release-commit-not-green] INTENTIUS/terragucci#1522
    tg-rollback cut-r1 the same refusal on 42696523fd80 INTENTIUS/terragucci#1522
    tg-stage-canary base-canary release output envs/dev/net id net-dev-v1 exited 1 INTENTIUS/terragucci#1522
    tg-stage-promote dev-on-merge release output envs/dev/net id net-dev-v2 exited 1; the merge carries terragucci/apply failure wave 1 of 1: 1 decided INTENTIUS/terragucci#1522
    tg-stage-soak cut-r1 the working tree has 1 untracked file(s) such as node_modules/ [release-worktree-dirty] fixed in INTENTIUS/terragucci#1523
    tg-stage-rollback-request cut-r1 the same refusal on 7684905f7bed fixed in INTENTIUS/terragucci#1523

    Under INTENTIUS/terragucci#1522 the terragucci/apply status reads failure when a wave member's outcome is decided, though every apply job on the commit passed. The two release-worktree-dirty bases lacked the .gitignore the tg-promote base has; INTENTIUS/terragucci#1523 adds it, and those two rows have not run since.

    sql-yodeler

    pipeline fails at the release cut on both granted runs, #5444.

    Open, and who each waits on

    Issue Rows Waits on
    #5443 pw-risk-record a chant fix
    #5444 sql-yodeler pipeline a chant fix and release, then a maintainer grant
    INTENTIUS/terragucci#1522 tg-promote, tg-rollback, tg-stage-canary, tg-stage-promote a terragucci fix, then a run on the local stack
    INTENTIUS/terragucci#1523 tg-stage-soak, tg-stage-rollback-request the merge, then a run on the local stack
    INTENTIUS/terragucci#1517 agent/drift a terragucci fix, then a maintainer grant
  10. lex00 commented on Nov 22, 2026

    @lex00
    ContributorAuthor

    Follow-up wave report, 2026-11-22

    This wave fixed what the open rows waited on and ran each row again. All of it sits on one branch per repo, wave/followups. The benches ran on local builds, against a pack of chant's branch, with no wait on CI.

    Pull requests

    Repo Pull request Merges
    chant #5472, closing #5443 and #5444 in the merge queue
    terragucci INTENTIUS/terragucci#1529, closing INTENTIUS/terragucci#1517, #1522, #1525 and #1527 after the chant release that carries #5472
    plywood INTENTIUS/plywood#182 after that release
    sql-yodeler INTENTIUS/sql-yodeler#407 after that release

    Each branch ran its full local gate once at the end of the wave. The results are in each pull request.

    Rows

    Every run used chant wave/followups at 8c5d35cb2, packed locally.

    Row Result Issue
    plywood, all eight rows passing; pw-risk-record passes now
    tg-stage-canary passing
    tg-stage-soak passing
    tg-stage-rollback-request passing
    tg-stage-risk, tg-agent-alert, respond/triage passing, from the last round
    tg-stage-promote failing at staging-waits; the bench's check script could not find chant, fixed on the branch, not run again
    tg-promote failing at base-applied; .terraform/ left the tree dirty, fixed on the branch, not run again
    tg-rollback failing: release cut auto has no earlier release to bump on a repo's first merge INTENTIUS/terragucci#1526
    agent/drift (granted) failing: the agent jobs are skipped, since the drift job's output is missing once it exits 2 INTENTIUS/terragucci#1528
    sql-yodeler pipeline (granted) failing at the first stage's release cut, release-next-no-previous INTENTIUS/sql-yodeler#406

    INTENTIUS/terragucci#1526 and INTENTIUS/sql-yodeler#406 fail on the same refusal. The release-cut hook that chant writes runs release cut auto, which refuses a repo with no release yet. The fix most likely belongs in chant's hook, and that would clear both rows.

    Open, and who each waits on

    Issue Rows Waits on
    INTENTIUS/terragucci#1526, INTENTIUS/sql-yodeler#406 tg-rollback, sql-yodeler pipeline a chant fix to the first cut, then a run (the pipeline row needs a maintainer grant)
    INTENTIUS/terragucci#1528 agent/drift a terragucci fix, then a maintainer grant
    the bench fixes in INTENTIUS/terragucci#1529 tg-stage-promote, tg-promote a run on the local stack, no grant
    #5463 none; the drift issue gets no link to the agent's pull request a chant fix
    #5472 the products' pull requests the merge queue, then a chant release
  11. lex00 commented on Nov 22, 2026

    @lex00
    ContributorAuthor

    Follow-up wave, round 2, 2026-11-22

    Round 1 left four rows failing: tg-rollback, tg-promote, tg-stage-promote and agent/drift, plus sql-yodeler's pipeline. This round fixed what they waited on and ran each again. The benches ran against a local pack of chant's wave/followups-2.

    Pull requests

    Repo Pull request Merges
    chant #5477, closing #5463, #5474 and #5475 merged, released in 0.124.116
    terragucci INTENTIUS/terragucci#1529, closing INTENTIUS/terragucci#1517, #1522, #1525, #1526, #1527, #1531 and #1532 in the merge queue, on chant 0.124.116
    sql-yodeler INTENTIUS/sql-yodeler#413, closing INTENTIUS/sql-yodeler#406 and #409 in the merge queue, on chant 0.124.116

    Each branch ran its full local gate once at the end of the wave. Tests that timed out under load passed when run again with fewer workers. The details are in each pull request.

    Rows

    Row Result Issue
    plywood, all eight rows passing, from round 1
    tg-stage-canary, tg-stage-soak, tg-stage-rollback-request passing, from round 1
    tg-stage-risk, tg-agent-alert, respond/triage passing, from earlier rounds
    tg-rollback passing
    tg-promote passing
    tg-stage-promote passing
    agent/drift (granted) passing; the drift issue links the agent's pull request
    sql-yodeler pipeline (granted, 1 of 2 runs) failing at the prod approval: yodel approve pipeline-prod --plan refuses the release digest the stage gate waits on INTENTIUS/sql-yodeler#411

    The pipeline row now gets past the first release cut and the staging promote. In a project with waves, yodel approve looks for the plan under the migrate and wave gates, so it misses the pipeline's stage gate.

    Open, and who each waits on

    Issue Rows Waits on
    INTENTIUS/sql-yodeler#411 sql-yodeler pipeline a sql-yodeler fix, then a maintainer grant
    #5479 none; chant's own e2e run of the pipeline path, so chant finds these bugs before a product bench does design and a chant change
    #5480 none; one call for where a change waits, after each product wired the approvals wrong in a different place design in chant

    Lines this round turned up, for later:

    • During terragucci's just claims setup, the example pipeline failed with its tips job blocked. The claims passed.
    • A direct chant run --components into a gated stage now waits at the stage's gate. It still skips holds, freeze windows and pauses.
    • A sql-yodeler project under promotion has an apply run with a single job, so --own-run-jobs has no job to name there. Its cut still needs the checks from another workflow.
    • fix: first cuts, drift outputs, own-run jobs and stage gates for the delivery benches #5477 changed the gitlab lexicon's agent jobs, and npm still has chant-lexicon-gitlab at 0.124.103. Neither bench uses it.
    • release.first defaults to 0.1.0 in the pipeline hook. Making it opt-in instead is open.
  12. lex00 commented on Nov 22, 2026

    @lex00
    ContributorAuthor

    A correction to the report above: INTENTIUS/sql-yodeler#413 merged without its pin move, because that push did not land. INTENTIUS/sql-yodeler#414 carried it, and sql-yodeler's main is on chant 0.124.116. INTENTIUS/terragucci#1529 has merged too, so every pull request of the wave is in.

  13. lex00 commented on Nov 22, 2026

    @lex00
    ContributorAuthor

    Follow-up wave 3, 2026-11-22

    This wave took the three lines left open after the follow-up wave: #5480, #5479 and INTENTIUS/sql-yodeler#411. It then ran sql-yodeler's pipeline row again. chant and sql-yodeler each had one branch, wave/followups-3, and sql-yodeler built against a local pack of chant's.

    Pull requests

    Repo Pull request Merges
    chant #5487, closing #5479 and #5480 merged, released in chant 0.124.117
    sql-yodeler INTENTIUS/sql-yodeler#416, closing INTENTIUS/sql-yodeler#411 in the merge queue, on chant 0.124.117

    Each branch ran its full local gate once at the end of the wave. The details are in each pull request.

    Results

    Line Result
    #5480 pendingApprovals lists what waits for approval in an environment, with each gate's kind, op and digest. chant approve --env uses it. The design and the answers to the issue's questions are on #5480.
    #5479 a two-stage pipeline e2e on chant's local Forgejo harness, passing 7 of 7 in about a minute. It found no chant bugs.
    INTENTIUS/sql-yodeler#411 yodel approve asks pendingApprovals where the environment waits, and approves a stage gate on its release digest.
    sql-yodeler pipeline (granted, 1 of 2 runs) failing one step later, at the stage's own wave: yodel approve records the approval at the merge pipeline's wave gate, where nothing waits. INTENTIUS/sql-yodeler#415

    The gitlab lexicon line in the last report was wrong: the chant 0.124.116 release did publish chant-lexicon-gitlab, as 0.124.103 (up from 0.124.102), and that package carries #5477's change.

    Open, and who each waits on

    Issue Rows Waits on
    INTENTIUS/sql-yodeler#415 sql-yodeler pipeline a sql-yodeler fix, then a maintainer grant
    #5482 none; a lint warning when a stage and a component in it both ask for approval a chant change

    These stay open lines from earlier rounds:

    • A direct chant run --components into a gated stage skips holds, freeze windows and pauses.
    • release.first defaults to 0.1.0 in the pipeline hook, and making it opt-in is open.
    • A sql-yodeler apply run with a single job gives --own-run-jobs no job to name.
    • terragucci's example pipeline had its tips job blocked during just claims setup.
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    epicepic:delivery

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions