Skip to content

fix: pipeline stages take their wave's gate, and chant 0.124.116 - #413

Merged
lex00 merged 2 commits into
mainfrom
wave/followups-2
Nov 22, 2026
Merged

lex00 merged 2 commits into
mainfrom
wave/followups-2

Conversation

@lex00

@lex00 lex00 commented Nov 22, 2026 •

Copy link
Copy Markdown
Contributor

Closes #406
Closes #409

The follow-up wave's sql-yodeler changes for the pipeline row on INTENTIUS/chant#5337, and the move to chant 0.124.116, which carries INTENTIUS/chant#5477.

The pipeline row

It ran once on a maintainer grant, against a local pack of chant's wave branch. The merge cut release 0.1.1, the prod-before-staging refusal held, and the staging promote applied. It stops at the prod approval on #411: in a project with waves, yodel approve misses the pipeline stage's gate. That fix is for a later pull request.

Local gate

npm run check ran once at the end of the wave against the local chant pack. 1,158 tests passed. The two ci-pipeline tests that expect the old release-cut command failed; the pin move updates them. After the pin move the build and its static checks pass, and so do test/ci-pipeline.test.ts and npm run templates:check.

pipelineFromConfig got no gate for a stage, so a promote into a stage whose wave says never waited for an approval. The stage now takes its wave's gate and approval mode; a wave that sets none leaves chant's default.

gate deferred to the end of the wave
promote prints 'yodel approve <env> --plan <digest>'; the claim looked for chant's wording and found nothing. It now reads yodel's line and runs it through yodel's CLI with the environment's name typed and --actor claims-approver. The stage gate is checked on the env and the release digest, the wave gate on the env and a digest apart from the release's.

Checked: tsc and eslint clean, scenarios/run.ts --list. The claim itself was not run (needs a grant).

gate deferred to the end of the wave
@lex00
lex00 enabled auto-merge November 22, 2026 18:48
@lex00
lex00 added this pull request to the merge queue Nov 22, 2026
Merged via the queue into main with commit e99f076 Nov 22, 2026
8 checks passed
@lex00
lex00 deleted the wave/followups-2 branch November 22, 2026 19:34
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

1 participant